What to Do After BTO Key Collection: Your First 30 Days
The quick answer
In your first 30 days after BTO key collection, inspect the flat and report every defect to your Building Service Centre before renovation starts. HDB's MyNiceHome guide says to report defects within 30 days of key collection. Use the same weeks to open your SP utilities account, confirm your insurance, and get your renovation contractor (from HDB's Directory of Renovation Contractors) to apply for permits.
Key points
- Report all defects within 30 days of key collection, before renovation starts (HDB MyNiceHome, 2026).
- Your Defects Liability Period (DLP) is 1 year from your key collection date. The 30 days is about proving who caused a defect, not the end of your cover.
- Defects go to the Building Service Centre (BSC) in your project, or through the QR code in your Welcome Kit.
- Open a utilities account with SP Services before you move in.
- HDB Fire Insurance is compulsory if you have an HDB loan.
- Your contractor must be listed in HDB's Directory of Renovation Contractors (DRC).
- Toilet wall and floor finishes cannot be removed for the first 3 years in a new flat. Plan your bathroom design around this.
We're homeowners too. We remember standing in an empty flat with a bunch of keys and a long list in our heads. This guide puts that list in order.
What should I do first after BTO key collection?
Walk the flat before anything else. Don't let any contractor in until you've checked every room.
HDB's MyNiceHome guide is clear on timing: "You must report all defects within 30 days of key collection, before commencing renovation works." The reason is simple. Once hacking and carpentry start, it gets hard to tell whether a crack or a hollow tile came from HDB's builder or your renovation team.
So your first week is for inspection. Bring painter's tape or Post-it notes, mark each defect, and write it on a list. That is exactly the method MyNiceHome suggests. Our full room-by-room list is in the BTO defect checklist.
The first 30 days, week by week
| When | What to do | Why |
|---|---|---|
| Day 1 (key collection) | Bring your NRIC and the items listed in your appointment details on HDB's MyHDB Page. If you have an HDB loan, make sure your HDB Fire Insurance is in place. Open your SP Services utilities account (at HDB Hub, online or in the SP app). | Fire insurance is compulsory with an HDB loan. Everyone needs an SP utilities account. |
| Days 1–7 | Inspect every room. Mark defects with tape. Photograph each one. | Defects must be reported before renovation starts. |
| Days 3–10 | Submit your defect list to the Building Service Centre (QR code in the Welcome Kit, or the BSC office in your project). | BSC staff do a joint inspection and arrange repairs. |
| Days 7–21 | Meet designers or contractors. Check each one is on HDB's DRC. Get itemised quotes. | Only DRC-listed contractors may renovate an HDB flat. |
| Days 14–30 | Confirm your design. Your contractor applies for the HDB renovation permit. | Works that need a permit cannot start until it is approved. |
| By day 30 | Make sure every defect is reported. Coordinate repair dates with BSC so they don't clash with renovation. | MyNiceHome says repairs typically take under two weeks. |

You can map your own dates with our BTO key collection planner. Put in your key date and it lays out the same steps for you.
When is the defect reporting deadline for BTO?
This is where people get confused, so here is the plain version.
- 30 days: HDB asks you to report defects within 30 days of key collection, before renovation.
- 1 year: Your Defects Liability Period is 1 year, starting from your key collection date. HDB's building contractor fixes covered defects during this time.
The 30 days is not the end of your protection. It's the window to report what you can see before your renovation muddies the picture. Defects that show up later in the year can still be reported to the BSC. The BSC itself runs for a year after the first keys in your project are issued, according to HDB's project toolkit.
HDB also gives new flat owners a longer warranty on some defects: 5 years for ceiling leaks and external seepage, and 10 years for spalling concrete. Note that the leak warranty ends if floor tiles are changed or the waterproofing is tampered with. More on that in the BTO defect checklist.
What is not counted as a defect?
MyNiceHome lists two things that are normal, not defects:
- slight colour differences between floor tiles or timber flooring
- small differences in the width of tile grout lines
These come from natural materials and hand-laid work. Don't spend your BSC visit on them.
What to book and when, from key collection to move-in day. Plan my BTOWhich insurance do I need at key collection?
- HDB Fire Insurance: compulsory if you take an HDB housing loan. It covers reinstating damaged internal structures after a fire. It does not cover your renovation or furniture.
- Home Protection Scheme (HPS): compulsory if you pay your monthly loan instalments with CPF savings. It protects against losing the flat through death, terminal illness or permanent disability.
- Home contents insurance: optional. Depending on the policy, it may cover renovation, fittings, furniture and appliances.
Since a renovation is often one of the biggest things you'll put into the flat, ask your insurer whether their contents policy covers it.
When can I start renovating my BTO?
You can start once your defects are reported and the permits your works need are approved. A few rules shape the plan:
- Use a DRC contractor. MyNiceHome: "The renovation contractor you engage must be listed in the HDB Directory of Renovation Contractors."
- Permits come first. You, the owner, are responsible for getting all HDB permits before work starts. Your contractor submits the application online. Hacking or building walls needs layout plans and details with the application.
- Finish on time. MyNiceHome says that once HDB approval is obtained, renovation should be completed within 3 months for new flats.
- Mind the hours. General works: Monday to Saturday, 9am to 6pm. Noisy works such as hacking: Monday to Friday, 9am to 5pm only. No work on Sundays and public holidays, and no noisy work on the eve of major public holidays.
- Leave toilet finishes alone for 3 years. New flats have a 3-year restriction on removing toilet wall and floor finishes, to protect the waterproofing. You can overlay new tiles on the old ones instead.
The full rules are in our HDB renovation permit guide. Thinking of opening up the kitchen or joining two bedrooms? Read Can you hack your BTO walls? first.

How long does a BTO renovation take?
Qanvast's 2026 estimates, based on 2025 project data, put BTO renovation time at about:
- 3-room: 6 to 8 weeks
- 4-room: 8 to 10 weeks
- 5-room: 9 to 10 weeks
These are typical figures from one platform, not rules. Your scope, carpentry lead times and permits all move the dates.
How much should I budget?
Qanvast's 2026 estimates (from 2025 medians, published February 2026) for BTO renovation are:
| Flat type | Qanvast 2026 estimate |
|---|---|
| 3-room BTO | S$40,800 – S$52,500 |
| 4-room BTO | S$50,000 – S$60,000 |
| 5-room BTO | S$60,600 – S$76,500 |
Try our renovation cost estimator for a figure based on your own rooms. If you want to see a style before you spend, Restyle my room turns a photo of your empty room into a design concept.
Small things that save headaches
- Protect what HDB gave you. MyNiceHome suggests asking your contractor to wrap doors and handles in cardboard or bubble wrap.
- Cover the Home Fire Alarm Device with a plastic sheet during works, then remove the sheet when done.
- Tell your neighbours. MyNiceHome asks contractors to give neighbours a heads-up, and not to hog or block the lifts.
Questions homeowners ask
Do I have to report BTO defects within 30 days?
HDB's MyNiceHome guide says to report all defects within 30 days of key collection, before renovation starts. Your DLP still runs for 1 year, so later defects can still be reported.
Can I start renovation on the day I collect my keys?
Only after defects are reported and any permits your works need are approved. Inspect first. Most of your first week should be spent checking the flat.
Who do I report BTO defects to?
The Building Service Centre in your project. You can also scan the QR code in your Welcome Kit or on the notice pasted on your kitchen wall.
Can I change my BTO bathroom tiles straight away?
No. New flats have a 3-year restriction on removing toilet wall and floor finishes. You can overlay new tiles instead.
Do I need HDB Fire Insurance?
Yes, if you have an HDB housing loan. It doesn't cover your renovation or furniture, so consider home contents insurance too.
Who can help with my BTO renovation after key collection?
CAsarté Interior is a Singapore design-and-build firm for HDB, condo and landed homes. We give fixed-price itemised quotes, one project manager from start to finish, and a 1-year workmanship warranty. We're homeowners too, so we plan around your key date and your defect window. WhatsApp +65 8902 7516.
Sources
| # | URL | Page title | What it supports | Accessed |
|---|---|---|---|---|
| 1 | https://www.mynicehome.gov.sg/hdb-how-to/move-into-your-flat/a-guide-to-defects-inspection-for-your-new-hdb-bto-flat/ | How to Move Into Your HDB Flat (MyNiceHome, updated 27 Jul 2026) | 30-day defect reporting; 1-year DLP from key collection; BSC joint inspection; repairs under two weeks; tape and list method; tile colour and grout not defects | 18 Nov 2026 |
| 2 | https://www.mynicehome.gov.sg/hdb-how-to/move-into-your-flat/collecting-the-keys-to-your-hdb-flat/ | How to Move Into Your HDB Flat (MyNiceHome) | SP Services utilities account; HDB Fire Insurance with HDB loan; QR code in Welcome Kit; protect doors; cover Home Fire Alarm Device | 18 Nov 2026 |
| 3 | https://www.mynicehome.gov.sg/hdb-how-to/move-into-your-flat/a-guide-to-home-insurance-for-your-hdb-flat/ | How to Move Into Your HDB Flat (MyNiceHome) | HPS mandatory with CPF instalments; Fire Insurance mandatory with HDB loan; contents insurance may cover renovation | 18 Nov 2026 |
| 4 | https://file.go.gov.sg/hdb-tanjongtreeresidences-file.pdf | HDB project toolkit, Tanjong Tree Residences @ Hougang | BSC runs for a year from first keys; QR code in Welcome Kit or kitchen wall notice; Fire Insurance covers internal structures, contents insurance optional | 18 Nov 2026 |
| 5 | https://www.mynicehome.gov.sg/hdb-how-to/renovate-your-flat/ | How to Renovate Your HDB Flat (MyNiceHome, updated 24 Jun 2026) | DRC rule; owner responsible for permits; 3-month completion for new flats; working hours; 3-year toilet rule; neighbours and lifts | 18 Nov 2026 |
| 6 | https://www.mynicehome.gov.sg/hdb-how-to/maintain-your-flat/a-guide-to-maintaining-your-hdb-flat/ | How to Maintain Your HDB Flat (MyNiceHome, updated 17 Aug 2026) | Extended warranty: 5 years ceiling leaks and external seepage, 10 years spalling; void if floor tiles changed | 18 Nov 2026 |
| 7 | https://www.hdb.gov.sg/managing-my-home/renovation-and-maintenance/rectification-of-defects-in-new-flats | Rectification of Defects in New Flats (HDB) | DLP is one year; report online or at BSC | 18 Nov 2026 |
| 8 | https://www.hdb.gov.sg/buying-a-flat/bto-sbf-and-open-booking-of-flats/process-for-buying-a-new-flat/key-collection | Key Collection (HDB) | Check appointment details on MyHDB Page; fire insurance from HDB's appointed insurer with an HDB loan | 18 Nov 2026 |
| 9 | https://www.cpf.gov.sg/service/article/what-is-the-difference-between-home-protection-scheme-hdb-fire-insurance-and-home-insurance | Difference between HPS, HDB Fire Insurance and home insurance (CPF Board) | Fire Insurance covers reinstating damaged internal structures and fixtures | 18 Nov 2026 |
| 10 | https://qanvast.com/sg/articles/what-are-the-expected-renovation-costs-for-hdb-flats-in-2026-3568 | What are the Expected Renovation Costs for HDB Flats in 2026? (Qanvast, 12 Feb 2026) | BTO cost ranges and durations by flat type | 18 Nov 2026 |