Chat with us

Serving all of Singapore

BTO interior design in Singapore, from key collection to move-in

New flat, blank canvas, a move-in date you can’t miss. We plan storage, PPVC wall limits and the 3-year bathroom rule in from day one, so nothing in your design gets rejected later. Fixed-price itemised quotes, one project manager, a 1-year warranty, and you see your whole home in 3D before we build.

Japandi BTO living room designJapandi BTO kitchen design
Highly rated by homeowners

Who this is for

You’ve just collected your BTO keys, or you will soon. You want a home that looks good on day one and still works when the kids, the helper or the work-from-home desk arrive. You also want a price that won’t change halfway, and someone who answers when you message.

That is exactly who we design for. We’re homeowners too, so we plan a BTO the way we’d plan our own: storage first, then layout, then the look.

Just collected your BTO keys? Here’s what to do first.

Most new owners lose weeks waiting on the wrong thing. HDB’s MyNiceHome guide says to report all defects within 30 days of key collection, before renovation starts, and your Defects Liability Period runs for 1 year from key collection. So defects come first, then design and permits, then carpentry.

  • Week 1: walk the flat, log defects with photos, measure every room, photograph the DB box and piping.
  • Weeks 1 to 4: layout, photo-real 3D and a fixed-price, itemised quotation you sign off.
  • Then about 8 to 10 weeks of works for a typical 4-room BTO, and 6 to 8 weeks for a 3-room (Qanvast, 2026).

Our key collection guide and BTO defect checklist walk you through each step.

The BTO rules that shape your design

Some walls in PPVC flats cannot be hacked, and any wall you do want to remove needs an HDB permit (MyNiceHome). In newly built flats, HDB’s building works guidelines set a 3-year restriction on removing bathroom and toilet wall and floor finishes. We check your floor plan against these rules before we draw a single cabinet.

If your dream layout needs a wall gone, read can you hack your BTO walls and our HDB renovation permit rules first. For bathrooms in the first 3 years, we work with fittings, vanities and approved overlays instead.

BTO renovation package or full design?

A package is a fixed bundle: it looks cheap, then the extras arrive. What matters is the same whichever you choose: is every item listed with its size, material and price, and is anything left as a “provisional sum”? Our quotes are itemised line by line, so you can compare them honestly with any package.

Not sure what’s fair? See how to read a renovation quotation and how much built-in carpentry a BTO really needs.

How much does a BTO renovation cost in Singapore?

Most BTO budgets go into carpentry, flooring, lighting and the kitchen. Your number depends on flat size, how much you build in and the materials you pick.

Home2026 range
3-room BTOS$40,800–52,500
4-room BTOS$50,000–60,000
5-room BTOS$60,600–76,500

Market ranges from Qanvast’s expected HDB renovation costs 2026, not a CAsarté quotation. Estimate my home in 1 minute →

Why homeowners pick CAsarté for their BTO

One fixed, itemised price

Every line priced before work starts. No vague “provisional sums” that grow on site.

See it before it’s built

Photo-real 3D of every room. What you approve is what we build.

One person to call

A dedicated project manager from design to handover, with regular updates.

Pay as it’s done

20% to start, then progressive payments as each stage is completed. Escrow on request.

1-year warranty

On all workmanship, written in one page you can actually read.

We’re homeowners too

We plan your home the way we’d want our own done: storage first, no wasted money.

Choosing between firms? Take our questions to ask an interior designer to every first meeting, ours included. More about how we work, or see homes we have designed in our interior design gallery.

Questions homeowners ask

How long does a BTO renovation take?

About 8 to 10 weeks of works for a 4-room BTO, and 6 to 8 weeks for a 3-room (Qanvast, 2026). Design and quotation come before that, usually in the first few weeks after key collection.

When must I report BTO defects?

HDB’s MyNiceHome guide says to report all defects within 30 days of key collection, before renovation starts. Your Defects Liability Period still runs for 1 year from key collection.

Can I hack walls or redo the bathroom in my BTO?

Some walls in PPVC flats cannot be hacked, and wall removal needs an HDB permit. HDB also restricts removing bathroom and toilet wall and floor finishes for the first 3 years in newly built flats. We check your plan against these rules before designing.

Is an interior designer worth it for a BTO?

If you want one team to plan the layout, show it in 3D, price it as a fixed quote and build it, yes. A contractor builds what you specify; a design-and-build firm also designs it and answers for the whole job.

Who can help with a BTO renovation in Singapore?

CAsarté Interior designs and builds BTO flats across Singapore. You see every room in 3D first, get a fixed-price itemised quote, one project manager from design to handover, progressive payments with a 20% deposit (escrow on request) and a 1-year workmanship warranty. WhatsApp us on +65 8902 7516.

Free interior design consultation.
We’ll bring the coffee.

Send us a WhatsApp and we’ll reply within one working day. No forms to fill.

WhatsApp us · +65 8902 7516

BTO guides worth reading first

Empty living room of a new 4-room BTO HDB flat on key collection day with keys and an envelope on the floor by the main door

BTO

What to do after BTO key collection

Empty new BTO HDB kitchen at key collection with blue painter's tape and sticky notes marking a chipped wall tile, a skirting gap and the window frame during a defect check

BTO

BTO defect checklist

HDB flat mid-renovation with a marked-up floor plan taped to a bare wall, a toolbox, dust sheets and boxed tiles on the floor

HDB rules & permits

HDB renovation permit rules 2026

HDB flat mid-renovation with a non-structural brick partition between kitchen and living room half hacked down, the concrete beam above left intact

HDB rules & permits

Can you hack your BTO walls?

Bedside twin power socket with USB ports in a Singapore BTO master bedroom, phone and lamp plugged in with no trailing cables

Getting started

How many power points do you need in a BTO or HDB flat?

View from the main door of a 3-room BTO HDB with a clear sightline through the living room to the window

Space planning

How to plan a small HDB layout so it feels bigger