Reno Tips & Insights / Getting started
How many power points do you need in a BTO or HDB flat?
The quick answer
Walk through a normal day in each room, count every plug you'd reach for, then add two. That's roughly the right number. Adding a point during renovation costs a little; adding one later can mean hacking a wall. Plan it most carefully in the bedroom, study, living area and kitchen.
Key points
- Almost nobody regrets adding power points. Almost everybody regrets skipping them.
- CAsarté's rule: count every plug you'd use in a normal day, then add two.
- A 2026 Singapore guide puts a power point at about $45–$90 each.
- Electrical work must be done by a Licensed Electrical Worker (LEW).
- Some electrical works in HDB flats need an HDB permit, such as new 15A points in flats without higher electrical loading.
Why do power points matter so much?
Because the alternative is extension cords trailing across the floor and piled on the bedside table. We're homeowners too, and we've lived with that. It looks messy, and it's the first thing that makes a new home feel unfinished.
How do you work out how many power points you need?
Plan around how you actually live:
- How many devices do you charge each night, and where?
- Where does the robot vacuum park?
- Do you iron in the bedroom?
- How often do you reach for the air fryer, blender or kettle?
- Do you work from home with a monitor, laptop and lamp?
Then use our rule: walk through a normal day in each room, count every plug you'd reach for, and add two.

How many power points per room? A starting guide
These are planning prompts, not fixed numbers. Your count comes from your own day.
| Room | What to plan for | Notes |
|---|---|---|
| Living (TV wall) | TV, set-top or streaming box, soundbar, router, console | Qanvast's designers suggest at least 4 power points (2 double sockets) at the TV console, up to 6 for tech-heavy homes |
| Living (sofa side) | Phone charging, floor lamp | A point near each end of the sofa saves cords across the floor |
| Kitchen | Fridge, oven, washer, plus kettle, rice cooker, air fryer | Fixed appliances need dedicated points; plan sockets for frequently used countertop appliances |
| Kitchen (induction) | Induction hob | Plan the wiring before carpentry; designers warn that skipping this can leave unsightly casing inside your lower cabinets |
| Master bedroom | Both bedsides, dressing area, hair dryer | Points by the bed for phones, by the vanity for a hair dryer |
| Study | Monitor, laptop, lamp, printer | Points at desk height, not only at floor level |
| Common bedroom | Bedside, desk, fan or lamp | Think of how the room will be used in five years |
| Anywhere with carpentry | Lighting in shelves or wardrobes | Plan LED provisions inside carpentry early |
Don't forget data points. Qanvast's designers list skipping data points outside the living room as a common mistake.
How much does a power point cost in Singapore?
| Item | Indicative cost | Source year |
|---|---|---|
| Power or lighting point | about $45–$90 | 2026 quotation guide |
| Power or lighting point | about $45–$75 | 2025 designer estimates |
| Concealed point | around $100–$120 | 2025 designer estimates |

The 2026 guide also estimates roughly 8–15 point relocations in a typical 4-room flat, so check the quantity on your quote, not just the rate. Our renovation cost calculator helps you budget the whole job.
What rules apply to power points in an HDB flat?
- Use a Licensed Electrical Worker. Singapore's electrical installation regulations require electrical works, such as installing wiring, to be undertaken by a Licensed Electrical Worker (LEW), and the Energy Market Authority says home electrical work, including adding power points, should be done or supervised by one. Your renovation firm should name who that is.
- Some works need an HDB permit. HDB says flats without higher electrical loading need an HDB permit to install new 15A power points for air-conditioners or other higher-capacity appliances. HDB lists the electrical works that don't need a permit on the same page.
Our guide to HDB renovation permit rules covers the full rules. Collecting keys soon? Mark electrical planning in our BTO key collection planner so it happens before carpentry.
Questions homeowners ask
Is it worth adding USB sockets?
For bedsides and desks, yes. They free up a plug for a lamp. Still plan regular sockets, since chargers change.
Should power points be planned before or after carpentry design?
Together. The point must land where the furniture and carpentry leave it reachable, and some appliances need wiring run before cabinets go in.
How many power points does a BTO come with?
It depends on the flat type and project. Check the electrical layout on your flat's floor plan and walk the unit at key collection.
Can I add power points later?
Yes, but it usually means chasing walls or running surface trunking. Doing it during renovation is cheaper and neater.
Who can plan power points around how my family lives?
CAsarté Interior is a Singapore design-and-build firm for HDB, condo and landed homes. We plan every point with you room by room, price each one in a fixed-price itemised quote, and give one project manager and a 1-year workmanship warranty. WhatsApp +65 8902 7516.
Sources
| URL | Title | What it supports | Accessed |
|---|---|---|---|
| https://www.smartcalculator.sg/articles/renovation-quotation-guide-singapore-2026 | Renovation Quotation Singapore (2026) | $45–$90 per electrical point; 8–15 relocations in a typical 4-room | 2026-11-18 |
| https://qanvast.com/sg/articles/homeowners-guide-to-electrical-wiring-costs-mistakes-and-more-3434 | Homeowner's Guide to Electrical Wiring (Qanvast, 2025) | $45–$75 per point; concealed points ~$100–$120; 4–6 points at TV; data points; LED provisions; induction wiring | 2026-11-18 |
| https://www.ema.gov.sg/consumer-information/electricity/engaging-licensed-workers | EMA: Engaging Licensed Electrical Workers | Home electrical work, incl. adding power points, should be done or supervised by an LEW | 2026-11-18 |
| https://www.meti.gov.sg/newsroom/written-reply-to-pq-on-electrical-installations-regulations/ | Written reply to PQ on Electrical Installations Regulations (4 Apr 2022) | Electrical works must be undertaken by an LEW | 2026-11-18 |
| https://www.hdb.gov.sg/managing-my-home/renovation-and-maintenance/renovation/renovation-guidelines/electrical-works | HDB: Electrical works | Permit for new 15A points in flats without higher electrical loading | 2026-11-18 |
| CAsarté Reno Starter Guide (internal) | The Truthful, No-BS Reno Starter Guide | Count plugs then add two; key rooms; cost now vs hacking later | 2026-11-18 |


